Pathways to Higher Education Project Center for Advancement of Postgraduate Studies and Research in Engineering Sciences, Faculty of Engineering - Cairo University (CAPSCU) Risk Assessment and Risk Management Prof. Dr. Atef M. A-Moneim Table of Contents Acknowledgement and Foreword Chapter 1: Risk Definition 1.1 Identifying Risk 1 1.2 Common Risks 1 1.3 Categorizing Risks 3 1.4 Mitigating Risks Chapter 2: Risk Management 2.1 Actions 8 2.2 Identifying Risk and Risk Classification 9 2.3 Risk Management 10 2.4 Expecting the Unexpected 12 2.5 Variation of Risk with the Project Management Life Cycle 13 2.6 Isolating Risk in the Work Breakdown Structure Chapter 3: Risk Assessment 3.1 The Impact of Risk 15 3.2 Risk Assessment of Several Risks Combined 15 3.3 Accounting for Increased Costs or Reduced Revenues 21 3.4 Communicating the Risk Analysis Chapter 4: Reducing Risk 4.1 Avoidance 23 4.2 Deflection 23 4.3 Contingency 26 4.4 Time and/or Cost 26 4.5 Contingency Plans 26 4.6 Controlling Risk 27 4.7 The Risk Management Plan 27 4.8 Monitoring Risk 27 4.9 Risk Reassessment References
Pathways to Higher Education Project Center for Advancement of Postgraduate Studies and Research in Engineering Sciences, Faculty of Engineering - Cairo University (CAPSCU) Risk Assessment and Risk Management Prof. Dr. Atef M. A-Moneim Table of Contents Acknowledgement and Foreword
Pathways to Higher Education Project
Center for Advancement of Postgraduate
Studies and Research in Engineering Sciences,
Faculty of Engineering - Cairo University
(CAPSCU)
Risk Assessment
and
Risk Management
Prof. Dr. Atef M. A-Moneim
Table of Contents
Acknowledgement and Foreword
1.1 Identifying Risk 1 1.2 Common Risks 1 1.3 Categorizing Risks 3 1.4 Mitigating Risks
1.1 Identifying Risk 1
1.2 Common Risks 1
1.3 Categorizing Risks 3
1.4 Mitigating Risks
2.1 Actions 8 2.2 Identifying Risk and Risk Classification 9 2.3 Risk Management 10 2.4 Expecting the Unexpected 12 2.5 Variation of Risk with the Project Management Life Cycle 13 2.6 Isolating Risk in the Work Breakdown Structure
2.1 Actions 8
2.2 Identifying Risk and Risk Classification 9
2.3 Risk Management 10
2.4 Expecting the Unexpected 12
2.5 Variation of Risk with the Project Management Life Cycle 13
2.6 Isolating Risk in the Work Breakdown Structure
3.1 The Impact of Risk 15 3.2 Risk Assessment of Several Risks Combined 15 3.3 Accounting for Increased Costs or Reduced Revenues 21 3.4 Communicating the Risk Analysis
3.1 The Impact of Risk 15
3.2 Risk Assessment of Several Risks Combined 15
3.3 Accounting for Increased Costs or Reduced Revenues 21
3.4 Communicating the Risk Analysis
4.1 Avoidance 23 4.2 Deflection 23 4.3 Contingency 26 4.4 Time and/or Cost 26 4.5 Contingency Plans 26 4.6 Controlling Risk 27 4.7 The Risk Management Plan 27 4.8 Monitoring Risk 27 4.9 Risk Reassessment
4.1 Avoidance 23
4.2 Deflection 23
4.3 Contingency 26
4.4 Time and/or Cost 26
4.5 Contingency Plans 26
4.6 Controlling Risk 27
4.7 The Risk Management Plan 27
4.8 Monitoring Risk 27
4.9 Risk Reassessment
References